ZXC10-BTS (V5.4) Installation Manual
9-6
B-B
Pinouts of
25-pin male
connector
End A
Green
30
10m
Label
B
B
1
2
3
4
Upper part of
the smoke sensor
(b)
(a)
( c)
End B
Red
Label
Lower part of
the smoke sensor
Green wire
Red wire
Fig. 9.2-1 Installing the Smog Sensor Base
Table 9.2-1 Terminal Connection of the Smog Sensor Cable Connector
Signal
25-pin Male Connector at End A Cable Color
Smog Sensor Base at End B
+12V 10
Red 3(+)
-12V 11
Green
1(-)
9.2.2 Installing the Indoor Temperature/Humidity Sensor
The temperature/humidity sensor is mounted on the wall. Select a proper position on
the wall in the equipment room, drill a hole of
Φ
6, put in a rubber cork, tighten the
captive screw, and finally hang the sensor on the wall through the hole. The dimensions
of the sensor is as shown in b of Fig. 9.2-2.
Both ends of the sensor connection line are DB9 connectors. As shown in a of Fig.
9.2-2, connect the DB9 male connector at end A to the DB9 socket, the
temperature/humidity socket on the BTS set top. And connect the DB9 female
connector at end B to the sensor.
The terminal connection of the cable connector is described in Table 9.2-2.
Содержание ZXC10-BTSB I2
Страница 1: ...ZXC10 BTSB I2 V1 0 cdma2000 System Base Transceiver Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......