FAX: 0086-755-26770160
-i-
List of Figures
Fig. 1.1-1 Overall Structure of the BTSB I2 Rack with the BDS Plug-in Shelf ...............................1-2
Fig. 1.1-2 Schematic Diagram of the BTS Equipment Installation...................................................1-3
Fig. 1.2-1 Hardware Installation Flow ..............................................................................................1-5
Fig. 3.2-1 Structure of the Wooden Box............................................................................................3-2
Fig. 3.3-1 Packing Box of the Module..............................................................................................3-4
Fig. 4.1-1 Outside View and Dimensions of the Rack ......................................................................4-2
Fig. 4.2-1 Layout of Equipment inside the ZXC10-BTSB I2 Equipment Room..............................4-3
Fig. 4.3-1 Assembly of the BTS Rack Base......................................................................................4-4
Fig. 4.3-2 Fixing the Base with the Rack..........................................................................................4-5
Fig. 4.3-3 Installation Holes of the BTS Rack ..................................................................................4-6
Fig. 4.3-4 Fixing the Rack.................................................................................................................4-7
Fig. 4.3-5 Installing the Rack Baffle Plates.......................................................................................4-8
Fig. 4.4-1 Enlarged View of the Cable Hole Cover Plate..................................................................4-9
Fig. 4.4-2 Assembling the Connecting Bars on the Cabinet Top ......................................................4-9
Fig. 4.4-3 Effect Diagram of Two Cabinets Installed......................................................................4-10
Fig. 5.1-1 BDS Power Cable Installation on BTSB ..........................................................................5-1
Fig. 5.2-1 Installation Flow of RFS Power .......................................................................................5-2
Fig. 5.3-1 RFS Power Cabling ..........................................................................................................5-3
Fig. 5.3-2 BDS Power Cabling .........................................................................................................5-3
Fig. 5.3-3 Connection between Busbar and Backplane.....................................................................5-4
Fig. 5.3-4 Connecting Power Cable (1).............................................................................................5-5
Fig. 5.3-5 Connecting Power Cable (2).............................................................................................5-6
Fig. 6.1-1 Wiring for the BTS Ground..............................................................................................6-2
Содержание ZXC10-BTSB I2
Страница 1: ...ZXC10 BTSB I2 V1 0 cdma2000 System Base Transceiver Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......