FAX: 0086-755-26770160
-i-
Contents
1 Overview of BTS Installation..................................................................................................................... i
1.1 Overview........................................................................................................................................1-1
1.2 Hardware Installation Flow............................................................................................................1-4
1.3 Precautions .....................................................................................................................................1-6
2 Installation Preparation.......................................................................................................................... 2-1
2.1 Installation Environment Inspection ..............................................................................................2-1
2.1.1 Inspection of the Equipment Room Building......................................................................2-1
2.1.2 Inspection of the Indoor Environment ................................................................................2-2
2.1.3 Inspection of Power Supply ................................................................................................2-3
2.1.4 Electromagnetic Radiation Protection Requirements..........................................................2-4
2.1.5 Grounding Inspection..........................................................................................................2-4
2.1.6 Inspection of the Installation Environment for the Outdoor Antenna Feeder System.........2-5
2.1.7 Safety Inspection.................................................................................................................2-6
2.1.8 Inspection of Corollary Equipment .....................................................................................2-6
2.2 Preparation of Tools and Instruments.............................................................................................2-7
2.3 Preparation of Technical Documents .............................................................................................2-8
3 Unpacking Inspection ............................................................................................................................. 3-1
3.1 Checking the Goods against the Packing List................................................................................3-1
3.2 Unpacking the Wooden Box...........................................................................................................3-2
3.2.1 Wooden Box Structure ........................................................................................................3-2
3.2.2 Unpacking ...........................................................................................................................3-2
3.2.3 Inspecting the Rack Outside View ......................................................................................3-3
3.3 Unpacking the Carton ....................................................................................................................3-3
Содержание ZXC10-BTSB I2
Страница 1: ...ZXC10 BTSB I2 V1 0 cdma2000 System Base Transceiver Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......