7.2 Installing the Cables for the Single-carrier BTS and the Two-Carrier BTS...................................7-3
7.2.1 Installing the RF Cables for a Single-carrier Single-sector BTS.........................................7-3
7.2.2 Installing the RF Cables for a Single-carrier Two-sector BTS............................................7-6
7.2.3 Installing the RF Cables for a Single-carrier Three-sector BTS .........................................7-9
7.2.4 Installing the RF Cables for a Two-carrier Three-sector BTS...........................................7-14
7.2.5 Connecting the Backplane Signal Cables for the Rack of a Single-carrier or Two-carrier
BTS ............................................................................................................................................7-17
7.3 Installing the Cables for the BTS of Three Carriers and Above...................................................7-17
7.3.1 Installing the RF Cables for a Three-carrier Three-sector BTS ........................................7-18
7.3.2 Installing the RF Cables for a Four-carrier Three-sector BTS ..........................................7-23
7.3.3 Connecting the Jumper Cables Between the Basic Cabinet and the Extended Cabinet....7-28
7.3.4 Connecting the Backplane Signal Cables of the BTS Rack ..............................................7-29
7.4 T1 Cabke ......................................................................................................................................7-31
7.4.1 Functions...........................................................................................................................7-31
7.4.2 Connection Position of Two Ends, Wiring and Signal Flow Direction of Cable ..............7-31
7.4.3 Function ............................................................................................................................7-32
7.4.4 Connection Positions of Both Ends, Cabling and Signal Flow Direction of Cables.........7-32
8 Installing the Trunk Cables.................................................................................................................... 8-1
8.1 Installing the Trunk Cables ............................................................................................................8-1
8.2 Preparing the T1 cables..................................................................................................................8-1
9 Installing the Monitoring System .......................................................................................................... 9-5
9.1 Composition of the Monitoring System .........................................................................................9-5
9.2 Installing the Monitoring System...................................................................................................9-5
9.2.1 Installing the Indoor Smog Sensor ......................................................................................9-5
9.2.2 Installing the Indoor Temperature/Humidity Sensor ...........................................................9-6
10 Installing the Main Antenna Feeder System..................................................................................... 10-1
10.1 Installation Preparation for the Antenna Feeder System ............................................................10-1
Содержание ZXC10-BTSB I2
Страница 1: ...ZXC10 BTSB I2 V1 0 cdma2000 System Base Transceiver Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......