1. The installation of the BTS cabinet, including the rack installation, the internal
cable installation, and the board installation and the DIP switch setting;
2. The installation of the power system to provide -48V operating power for the
system;
3. The installation of the grounding system to provide the protection ground for the
parts of the BTS equipment;
4. The installation of the antenna system, including the antenna positioning and
installation, jumper installation, feeder installation, and antenna feeder system
check and test;
5. The installation of the GPS system, including the installation of the GPS and the
feeder;
6. The installation of the trunk cable, including the connection of the cables and the
preparation of the connectors;
7. The installation of the monitoring system, including the installation of the
temperature/humidity sensor and the environment sensor.
BTS system installation is shown in Fig. 1.1-2.
Install the
GPS system
Install the rack
Install the
internal cables
Install the boards
Install the BTS cabinet
Install the
trunk cables
Install the power
supply system
Install the
grounding system
Install the
alarm system
Install the
antenna system
Fig. 1.1-2 Schematic Diagram of the BTS Equipment Installation
Содержание ZXC10-BTSB I2
Страница 1: ...ZXC10 BTSB I2 V1 0 cdma2000 System Base Transceiver Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......