Chapter 5 Cabinet Installation
Note:
The insulation test (refer to step
) must be implemented immediately after a cabinet
is installed.
Figure 5-35 Space Between Side-by-Side Cabinets
12. Connect neighboring cabinets with junction kits, see
5-27
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential