Chapter 5 Cabinet Installation
23. Verify that the horizontal and vertical deviations of cabinets in a row are in an accept-
able range.
The deviation should be less than 3 mm. If it does not meet the requirement, adjust
cabinets.
24. (Optional) Install a shockproof assembly on the cabinet if necessary.
l
For the shockproof assembly installation diagram when all the installation holes
are under the cable ladder in the equipment room, see
Figure 5-22 Installing the Shockproof Assembly (1)
1.
Horizontal
support
2.
Vertical support
3.
Cable ladder
4.
M12×25/M8×25
hexagon socket
cap head
bolt (Spring
washer, gasket,
and insulating
washer)
5.
Insulating gasket
6.
Lock rod (M8
hexagon nut,
spring washer,
and gasket)
7.
Bolt (M8 nut,
spring washer,
and gasket)
l
For the shockproof assembly installation diagram when the vertical connection
plates are not close to the cable ladder, see
5-17