NetNumen™ U31 R06 Hardware Installation Guide
d.
Set the shelf switch in Area B of the unified
to "ON". Repeat steps
to
to
verify that the input voltage of the shelf is normal.
3.
Check the operating status of the shelf.
a.
Set the switch of the
to "ON".
b.
Check the status of the indicators on the shelf components.
l
The H/S indicator on the New Fan Controller Module (
) flashes blue
several times and goes off, and then the RUN indicator flashes green.
l
The H/S indicator on the
flashes blue several times and goes off, and
then the OK indicator flashes green.
l
The HOST indicator on the New Chassis Management Module (
) is
flashing green. The ACT indicators on the active boards are lit, while the
ACT indicators on the standby boards are not lit.
l
The OK indicator on the
board is lit.
4.
Power on the board and check the board operating status.
Note:
If the board cannot be powered on or the memory is decreased after power-on, verify
that the board memory bar is properly installed.
a.
Close the handles of the switch boards in sequence to power on the boards.
The H/S indicator on the switch board flashes blue several times and goes off, and
then the OK indicator flashes green.
b.
Close the handles of the general processing boards in sequence to power on the
boards.
The H/S indicator on the general processing board flashes blue several times and
goes off, and then the OK indicator flashes green.
– End of Steps –
13-4
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential