NetNumen™ U31 R06 Hardware Installation Guide
Figure 5-6 Marking Holes for Installing Multiple Cabinets (Unit: mm)
1.
Installation hole
2.
Wall
3.
Put the drilling template on the marked positions. If the holes on the template match
the installation holes marked in step
, mark all installation holes for the base by using
a marker pen, see
If the holes do not match, adjust the holes so that the lines drawn in step
are correct.
Figure 5-7 Marking Installation Holes Using the Drilling Template
4.
In accordance with the position of the socket bolt marked on the floor, make an
indentation at the hole location first by using a punch to help locate the drill bit, see
.
5-6
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential