Chapter 12
Installation Inspection
Inspect the equipment room environment and the installation of cabinets, cables, and other
auxiliary facilities. Correct the problems found in the inspection to prepare for subsequent
software installation and system debugging.
Table of Contents
Checking the Power Cables and Grounding Cables .................................................12-2
12.1 Checking the Cabinets
This procedure describes how to verify that the cabinet installation complies with the
related design files and related standards.
Prerequisite
l
A spirit level, a multimeter, and a cross head screwdriver are ready.
l
The
Core Network Product Hardware Installation Quality Standard
is ready.
Steps
1.
Verify that the cabinets are installed in a proper position in accordance with the design
requirements.
2.
Verify that the cabinet installation meets the shockproof requirements.
3.
Verify that the horizontal and vertical deviations of the cabinets are less than 3 mm,
and that cabinet fronts installed in a row are aligned, with a deviation less than 5 mm.
4.
Use the multimeter to measure the resistance between the cabinets and ground, and
verify that the resistance is larger than 5 MΩ.
5.
Verify that all screws are tightened properly.
6.
Verify that no waste material, such as scrap of cable ties or cables, is left in the
cabinets, and that there is no dirt or handprint inside or outside the cabinets.
7.
Verify that all inlets and outlets on the cabinets are covered with cover plates or
rodent-resistant bags.
8.
Verify that the
wrist strap is connected to the
jack of the cabinet.
– End of Steps –
12-1
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential