2, As shown, positioning pins and new gearbox cover paper pads are placed on the gearbox joint surface, apply the oil
in the gearbox cover bearing surface, and install the gearbox cover in place, put 6 M8 × 40 bolts, from The positioning
pin position is pressed against the angle and is tightened, and the torque is 20 ± 2.5 N • m.
Output shaft retaining ring
Содержание ZT310M 2022
Страница 1: ...ZT310T M Engine maintenance Manual 2022 02 11...
Страница 6: ...Lubrication system One Lubrication system diagram...
Страница 7: ......
Страница 31: ...Cylinder piston One System components 6 7 5 8 9 10 3 2 1 4 11 12 13...
Страница 56: ...Right crankcase cover magneto One System components Part information...
Страница 70: ...Gearbox One System Components 12 1 3 2 4 6 9 10 5 7 8 13 14 15 16 17 19 18 11 20...