6
、
COOLING SYSTEM COMPONENT
55
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251100-121093 Non-standard bolt M6×25 (color zinc)
1
2
1274100-057095
Flanging bushing φ6.2×φ8.5×3.5
+
φ14×1.5
4
3
1244100-052000 Buffer rubber of flanging bushing
(
φ8.5×φ14×1
)
4
4
1224100-010000 ZT250
-
S swell nail
2
5
1251100-102000 Non-standard bolt M6×16
(
304 stainless steel
)
3
PROCEDURE:
●
Radiator decorative cover assembly
Using 6# inner hexagon socket remove the bolt
⑴
under the middle part of decorative cover and upper part of
pedal bracket, take off bushing
⑵
and buffer rubber
⑶
.
Remove the expansion pin after pressing the intermediate part of the expansion screw
⑷
.
Turn the front of the car to the left.
Using 4# inner hexagon socket remove 3 bolts
⑸
,take off the bushing
⑵
and buffer rubber
⑶
.
Grab the right side of the trim cover and pull it out as indicated by the green arrow at the arrow.
Grab the same part of the left side of the trim cover and pull it out.
CAUTION:
●
Pull out hard directly when pulling out, and do not shake it to the sides to prevent damage to the staples.
●
Pay attention to the surface of the material.
●
Disassemble the engine and radiator after they have been completely cooled.
Fig.4 COOLING SYSTEM
COMPONENT
Radiator covercomponent 1
Содержание ZT310-V1 EURO V
Страница 1: ...2021 1 13 Service manual ZT310 V1 EURO V ...