3
、
INTAKE SYSTEM COMPONENT
20
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1224100-010000 ZT250
-
S swell nail
2
2
1244100-061000 ZT250 anti
-
water rubber of frame
2
3
1250105-018091 GB5789 M8×70(white zinc)
2
4
4044201-256051 ZT310
-
V fender ball (dark grey matte)
2
5
1251100-102000 Non
-
standard bolt M6×16(304 stainless steel)
4
6
1274100-057095
Flanging bushing φ6.2×φ8.5×3.5
+
φ14×1.5
4
7
1244100-052000
Buffer rubber of flanging bushing (φ8.5×φ14×1)
4
8
1224200-193000 ZT310-VX rear shock absorber connecting rod plate
1
Fig.4 INDUCTION
SYSTEM COMPONENT
Replace the air filter element 1
PROCEDURE:
●
Side cover
Refer to the method of removing the side cover to remove the left and right side covers.
●
Connecting rod plate
Remove the connecting rod plate first by referring to the steps of the shock-absorbing connecting rod plate after
removal.
●
Support the whole motorcycle
Tilt the body to the left with the side bracket as the fulcrum, and then use a firm stool to support the muffler
back pressure package to keep the rear wheels off the ground. The front disc brake handle can be tied with a
cable tie to prevent the motorcycle from running forward. Support the entire vehicle before proceeding to the
next step.
CAUTION:
●
The bolt (3) does not need to be completely removed.
●
Pay attention to protect the buckle and paint surface when disassembling the side cover.
Содержание ZT310-V1 EURO V
Страница 1: ...2021 1 13 Service manual ZT310 V1 EURO V ...