IMPOR TANT:
Carefully remove the hose of the vacuum cleaner from the pool.
Begin filling your pool with water.Before making any openings
in the liner to fit the skimmer fill the pool with 60 cm (24”) of water
to stretch the liner fully to the skimmer box cut out. At this point you
may fit the skimmer box and eyeball fitting as per the following instructions.
ASSEMBLY OF TOP DECK
51
STEP 43.
STEP 44.
You must now install the deck caps.
The deck cap clips onto the EZ-Lock.
Apply a downward pressure on the cap
clips around the EZ-Lock.
Installation is performed in 2 steps as per
Demonstration align from the inside to the
outside. B) Clip the deck cap to the EZ lock by
grabbing and pulling it toward the outside of
the pool while simultaniously pushing the upright
toward the inside (c).
Important: Excessive pressure may damage this part.
B2
A2
J
D2
E
Содержание NOOSA REEF
Страница 10: ...ENLARGED VIEW OF COMPONENTS 8 F2 B2 K C F1 G B1 A2 J D2 E A1 L I...
Страница 22: ...20 Noosa Reef Deep End Excavation Channel Assembly...
Страница 39: ...WALL ASSEMBLY 37 Wall Short Wall Long STEP 27 Control Notch Control Notch...
Страница 45: ...DECK ASSEMBLY 43 7 99m x 4 57m 6 85m x 4 57m LONG TOP DECK LONG TOP DECK...
Страница 56: ...54 Backfill Requirements for Noosa Reef Inground Installation...