
LINER INSTALLATION
47
Mate
r
ials:
– Cardboard
A
n
ordi
n
ary vac
uum
clea
n
er ca
n
be
u
sed to re
m
ove the air betwee
n
the li
n
er a
n
d the wall.
This tech
n
iq
u
e helps yo
u
to re
m
ove
f
olds i
n
the li
n
er. However, the
f
ollowi
ng
preca
u
tio
n
s
sho
u
ld be take
n
:
- Do
n
ot
u
se a
n
i
n
d
u
strial vac
uum
clea
n
er, which co
u
ld be to power
fu
l.
- Tape the e
n
d o
f
the vac
uum
hose be
f
ore i
n
serti
ng
it i
n
to the ret
u
r
n
water
hole as
n
ot to da
m
a
g
e the li
n
er. Seal the hose to the wall with tape to preve
n
t
air leaka
g
e.
- I
n
sert the vac
uum
hose approxi
m
ately 20 c
m
(7î)
i
n
to the wall, a
n
d e
n
s
u
re that yo
u
will be able to
re
m
ove it later o
n
.
- Attach the hose to the wall with tape.
- Cover the ski
mm
er hole with cardboard a
n
d
tape i
n
place to preve
n
t air leaka
g
e.
Make sure the seam between the wall and
bottom sits on the cove.
STEP 36.
STEP 37.
Содержание NOOSA REEF
Страница 10: ...ENLARGED VIEW OF COMPONENTS 8 F2 B2 K C F1 G B1 A2 J D2 E A1 L I...
Страница 22: ...20 Noosa Reef Deep End Excavation Channel Assembly...
Страница 39: ...WALL ASSEMBLY 37 Wall Short Wall Long STEP 27 Control Notch Control Notch...
Страница 45: ...DECK ASSEMBLY 43 7 99m x 4 57m 6 85m x 4 57m LONG TOP DECK LONG TOP DECK...
Страница 56: ...54 Backfill Requirements for Noosa Reef Inground Installation...