ZEP SYSTEM I INSTALLATION MANUAL
Copyright © 2012 Zep Solar, Inc.
PAGE 45 OF 50
Installing Cam Feet in Spanner Bars
Ground Zeps
Rotate the Cam Foot into place in the module groove.
Rotate the Cam Foot into place in the
module groove using the Rock In por-
tion of the Flat Tool as shown.
Lock the Cam Feet into the Spanner Bar.
Hook the Flat Tool onto the bottom of
the Cam Foot and rotate 90 degrees
CCW to lock the Cam Foot into position
in the Spanner Bar.
The Flat Tool can be used to install Ground Zeps.
Place the Ground Zep in the module
groove.
Hook the Flat Tool over the Ground Zep
as shown.
Rotate 90 degrees CW to secure the
Ground Zep in the module groove.
1
2
1
2
1
2
Содержание Zep System I
Страница 1: ...VERSION 1 4 ...
Страница 12: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 8 OF 50 This page intentionally left blank ...
Страница 32: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 28 OF 50 This page intentionally left blank ...
Страница 40: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 36 OF 50 This page intentionally left blank ...
Страница 50: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 46 OF 50 This page intentionally left blank ...
Страница 54: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 50 OF 50 This page intentionally left blank ...
Страница 55: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2011 Zep Solar Inc This page intentionally left blank ...