ZEP SYSTEM I INSTALLATION MANUAL
Copyright © 2012 Zep Solar, Inc.
PAGE 18 OF 50
3-F: Secure the Cam Foot using the Flat Tool.
Use Flat Tool to tighten Cam Foot 1/4
turn clockwise as shown.
Ensure Cam Foot is oriented with the
Tongue side up as shown in Image 2.
3-G: Install remaining Cam Feet.
Repeat Steps 3-E and 3-F for the
remaining Cam Feet.
Use a string to ensure that Cam Feet
are aligned.
Adjust the Cam Feet on the Spanner
Bars as needed.
3-H: Adjust Cam Foot height.
The tops of all Cam Feet should be
coplanar.
Spin the top portion of the Cam Foot on
the threaded stud to level the Cam
Feet.
Verify that the Tongue sides of all Cam
Feet are facing the rear of the array,
ready to accept modules.
1
2
X X X
Содержание Zep System I
Страница 1: ...VERSION 1 4 ...
Страница 12: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 8 OF 50 This page intentionally left blank ...
Страница 32: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 28 OF 50 This page intentionally left blank ...
Страница 40: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 36 OF 50 This page intentionally left blank ...
Страница 50: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 46 OF 50 This page intentionally left blank ...
Страница 54: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 50 OF 50 This page intentionally left blank ...
Страница 55: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2011 Zep Solar Inc This page intentionally left blank ...