ZEP SYSTEM I INSTALLATION MANUAL
Copyright © 2012 Zep Solar, Inc.
PAGE 12 OF 50
3.2 - System Design
3.1 - Site Assessment Information
Spanner Clamps must be placed at a minimum distance of 4 inches from the top and bottom
edge of Spanner Bar N-S columns. The maximum allowable cantilever for a Spanner Clamp
relative to a Spanner Bar edge is either 1/3 of the Spanner Bar length or 1/3 of the Spanner
Bar E-W spacing, whichever value is lower.
l
r
9
3.3 - Getting Started
Please contact Zep Solar, Inc. to begin planning your Zep System I installation if you have not
done so a ready. You may contact Zep Solar, Inc. via:
Email to sales@zepsola .com
Phone to 1-415-32 -0768
Содержание Zep System I
Страница 1: ...VERSION 1 4 ...
Страница 12: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 8 OF 50 This page intentionally left blank ...
Страница 32: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 28 OF 50 This page intentionally left blank ...
Страница 40: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 36 OF 50 This page intentionally left blank ...
Страница 50: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 46 OF 50 This page intentionally left blank ...
Страница 54: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2012 Zep Solar Inc PAGE 50 OF 50 This page intentionally left blank ...
Страница 55: ...ZEP SYSTEM I INSTALLATION MANUAL Copyright 2011 Zep Solar Inc This page intentionally left blank ...