© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 34
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
First Module Row, Continued
Attach Leveling Feet to Rear Edge of Modules
North-South
drop-in
Position the Leveling Foot above
the Comp Mount by eye.
Key side
Flat face of Rockit should
be flush with module
frame.
5d
Manually insert the Key side of the
Leveling Foot into Zep Groove.
Do not attach the Leveling Foot
base until the next step.
iii
i
ii
Drop In Remaining Modules In First Row
Place the second module on
Tongue side of first row Leveling
Feet and Interlocks.
Align module with Interlock timing
marks. Allow 1/2 inch gap between
modules.
1/2 “
Array Skirt
i
ii
5c
Tolerance 1/4” - 3/4”