ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
8.
Remove remaining mid-array modules.
9.
Replace faulty module.
10. Re-connect wires.
11. Replace and secure mid-array Interlocks using Flat Tool.
12. Replace up-roof modules in column.
NOTE:
A ground/earth path must be maintained while modules are being serviced.
When removing an entire module column or otherwise isolating modules, use
additional Ground Zeps and jumpers during maintenance work.
6.2 Removing the Array Skirt
The Array Skirt serves as a jig during installation to mark the outside edges of the array, to identify
any potential conflicts between Interlocks and Leveling Feet, and to ensure that the first row of
modules is straight and level. However, the Array Skirt is not required for structural integrity, only
for convenience and aesthetic appearance. Therefore, installers may choose to remove the Array
Skirt subsequent to module installation.
1.
Remove all Jams from front-row Leveling Feet.
2.
Use the Flat Tool to open Interlock Zeps on Array Skirt from Position 3 to Position 1.
3.
Remove Array Skirt sections by rotating them up and off the front row Leveling Feet.
4.
The Interlocks are revealed with the Key side showing.
5.
After both sections of Array Skirt are removed, the Interlocks and Array Skirt Spacers
will be loose for removal. (Hybrid Interlocks can remain, and do not need to be
removed.)
6.
Re-install and secure the Interlock with the Key side facing inwards. Do not use the
Array Skirt Spacer.