3.1.1 Zepulator Layout Example
After all information is entered or selected, click the
Update
button on the
Layout
tab to see a
suggested layout similar to the one shown below. Note that the Zepulator optimizes the layout to
minimize the number of roof penetrations.
Figure 3.3 Example Zepulator Array Layout (ZS Comp, U.S.)
The array layout accounts for each ZS Comp component listed on the Bill of Material.
NOTE:
In cases where a Leveling Foot coincides with an Interlock location, you may
need to substitute a Hybrid Interlock. However, shifting the array to the east or
west may eliminate the need for Hybrid Interlocks altogether, especially when
using the Comp Mount C flashing. The Zepulator does not show Hybrid Inter-
locks on the layout, although it will include Hybrid Interlocks in Additional
Truck Stock to ensure adequate hardware supply if needed.
Ground Zep
Roof Attachment
and Leveling Foot
Array Skirt
PV module
Rafters
For ZS Comp, modules are
always installed (dropped-
in) starting at the gutter and
working towards the ridge,
parallel with the rafters
Interlock
Down-roof
The Zepulator centers the array in the specified roof
mounting area.