ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
Array Skirt, Continued
Install Remaining Sections of Array Skirt
Install next Interlock with an Array Skirt
Spacer.
Simultaneously tighten Interlock to Position 3
(closed) while rotating next section of Array Skirt
into place on the front-row Leveling Feet.
4c
i
ii
Rotate First Array Skirt Sections onto Key Side of Leveling Feet
Side view
4b
Down-roof
Bottom edge of Array Skirt should be
flush against Leveling Foot Rockit.
i
ii
Slide first Array Skirt sections to the
right or to the left, to identify the East-
West edges of the array. Adjust as
needed to avoid conflicts between
Interlocks and Leveling Feet, to reduce
the need for Hybrid Interlocks where
possible.