© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 21
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
Figure 4.8 North-South Drop-in, North-South Thermal Expansion Gap
Along the axis of the Interlock, large arrays also need a physical gap after two Thermal Expansion
Joints. For example, a North-South drop-in, Landscape orientation, might require a physical gap
approximately every 30 meters or 100 feet. This would be approximately every 18 module lengths,
depending on the module.
Figure 4.9 North-South Drop-In, Thermal Expansion East-West
Recommended
physical gap 12”
Array Skirt
Recommended
physical gap 12”
Recommended
physical gap 12”
Array Skirt
Thermal
Expansion
Joints
10
10
6
6
6
6