© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 30
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
Array Skirt, Continued
Insert Jams into Leveling Feet
Attach Array Skirt End Caps
Array Skirt End Caps attach on either end of the completed Array Skirt.
(The End Caps are optional accessory components.)
To completely secure the
Array Skirt, a Jam is
required in the Rockit of
every
front row Leveling
Foot.
4d
4e
i
ii
If the respective locations of a Leveling Foot and an Interlock overlap with one
another, there are several possible options, depending on which version of the
Interlock is available.
For more information see the following sections:
•
•
•
“Interlock Versions and Functionality”
•