© 2012/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0351-001 Rev B
Page 50
ZS COMP INSTALLATION MANUAL FOR COMPOSITION SHINGLE ROOFS - U.S.
6.3 Product Notes
Special Inset: Interlock Versions and Functionality
Timing Marks
Part No. 850-1388
The Interlock with 5 timing marks must be centered
with 1/2” gap between the PV modules using the
three center marks.
The Interlock with 7 timing marks can be 1.5” off-center
between the PV modules, up to marks as shown. Maintain
the same 1/2” gap between modules.
Part No. 850-1178
1.5”
Total range
1.5”
1/2” gap between
modules
range
Part No. 850-1388