Operation
INTRABEAM Water Phantom
Version 6.2
Page 36
G-30-1767-en
•
Move the probe tip downwards (in the Z axis) towards the measuring
chamber for the depth dose measurement until it is located only a few mil-
limeters above the measuring chamber. I.e. move the probe tip down-
wards just far enough so that a light gap is still clearly visible.
•
Position the probe tip in the center of the flattened portion of the meas-
uring chamber (by visual judgment). Perform this horizontal positioning by
actuating the X and Y micrometer screws.
Positioning the probe tip exactly using the current measurement
Using current measurements taken with the electrometer, the probe tip can
be positioned exactly above the center of the measuring window in the XY
plane.
•
Start X-ray radiation emission (“Beginning of treatment”).
Operation with the INTRABEAM 600
•
Open the folding shutter of the Workplace so that the electrometer is
accessible for operation. No other action is required, the electrometer is
automatically switched to manual operation.
Warning
If the shielding provided by the water tank is incomplete or if the user opens
one of the water tank covers while radiation is being generated, the user may
unintentionally come into contact with emitted X-ray radiation.
•
Ensure that the XRS mount is properly seated in the rotary feedthrough,
the XRS 4 is properly seated in the XRS mount, and all covers are properly
attached to the water tank.
•
Ensure that radiation is no longer being generated before opening any of
the water tank covers. Press the <Pause> button to stop emission of
radiation from the XRS 4.
NOTICE
The IC ionization chamber must be connected to the electrometer in order to
record the measured values.
•
Make sure that the IC ionization chamber is connected to the
electrometer.
INTRABEAM 600
For more information on how to call up the “Treatment” function and
which settings you need to configure, see page 48.
Содержание INTRABEAM
Страница 1: ...ZEISS INTRABEAM Water Phantom Instructions for Use G 30 1767 en Version 6 2 2022 02 24...
Страница 4: ...INTRABEAM Water Phantom Version 6 2 Page 4 G 30 1767 en Blank page for your notes...
Страница 15: ...Version 6 2 G 30 1767 en Page 15 INTRABEAM Water Phantom Safety measures Blank page for your notes...
Страница 17: ...Version 6 2 G 30 1767 en Page 17 INTRABEAM Water Phantom Safety measures Fig 1 Symbols and labels 1 2 3...
Страница 28: ...Preparations for use INTRABEAM Water Phantom Version 6 2 Page 28 G 30 1767 en Blank page for your notes...
Страница 45: ...Version 6 2 G 30 1767 en Page 45 INTRABEAM Water Phantom Operation Blank page for your notes...
Страница 47: ...Version 6 2 G 30 1767 en Page 47 INTRABEAM Water Phantom Operation...
Страница 49: ...Version 6 2 G 30 1767 en Page 49 INTRABEAM Water Phantom Operation Blank page for your notes...
Страница 74: ...System data INTRABEAM Water Phantom Version 6 2 Page 74 G 30 1767 en Blank page for your notes...
Страница 80: ...Index INTRABEAM Water Phantom Version 6 2 Page 80 G 30 1767 en Blank page for your notes...
Страница 81: ...Version 6 2 G 30 1767 en Page 81 INTRABEAM Water Phantom Blank page for your notes...