NMM=çÑ=NPQ
fåëíêìÅíáçå=j~åì~ä=`êçëëÄÉ~ã=PQM
=
ÉåMOE`loF
SK=léÉê~íáçå
`êçëëÄÉ~ã=çéÉê~íáçå
7
In the
SEM Column Valve
section, click
Close
.
The column chamber calve in the SEM is
closed.
The FIB gun valve is closed simultaneously.
8
Click the
Open Time
text field and enter
2
seconds.
9
Click the
Close Time
text field and enter a val-
ue of about
5
to
10
seconds.
10 Click the
Number of Loops
field and enter
5
.
CAUTION
Risk of damaging electron source and ion source
Before starting the outgassing procedure:
Ensure that EHT and FIB EHT are switched off.
Ensure that “SEM Column Valve“ and “FIB Gun Valve“ are closed.
11 To start the outgassing procedure, click
Go
.
12 Monitor the system vacuum by observing the
System Vacuum
value in the
Outgassing
panel.
If, after the 5th loop, the vacuum has not
reached 2 x 10
-5
mbar or better, which is the
pressure necessary for deposition, repeat the
procedure.
In this case, you should increase the number
of loops in future outgassing procedures.
The outgassing procedure ends automatically.
If you wish to stop the procedure prematurely, click Stop.
Содержание Crossbeam 340
Страница 1: ...Crossbeam 340 Crossbeam workstation Instruction Manual ...
Страница 24: ...OQ çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF OK p ÑÉíó p ÑÉíó ÉèìáéãÉåí ...
Страница 60: ...SM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF RK fåëí ää íáçå ...
Страница 120: ...NOM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Страница 126: ...NOS çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF NNK ÄÄêÉîá íáçåë ...
Страница 130: ...NPM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...
Страница 133: ......