en26
or
ZP SPEEDCONTROL COMFORT
en
English
6.1 Initial commissioning
1.
Make sure that voltage and frequency of the power supply and unit (see type plate)
match.
2.
Make sure that the pump shaft can rotate freely.
3.
The pump must be fi lled with water.
4.
Never put the pump into operation in a dry state!
5.
Open all existing closure units.
6.
Open at least one permanentconsumer, e.g. tapping point.
7.
When the pump is switched off , check the inlet pressure in the membrane
expansion tank and adjust it, if necessary, according to
Chapter 5.4.1 “Note on
installation of the membrane expansion tank”.
8.
All preparatory measures are now completed, and the plant can be put into
operation electrically.
6 Commissioning
!
Before commissioning, all connections have to be checked again for correct installation.
It must have been made sure that the safety regulations have been complied with.
Commissioning may only be performed by authorised qualifi ed staff .
Before you connect the ZP SPEEDCONTROL COMFORT to the power supply, the
pressure boost pump must have been mounted in accordance with the operating manual.
The water connections have to be carried out in a professional way.
!
The controller has been prepared by the factory for the connection of a three-phase
pump. If a single-phase pump shall be connected, it must be set up in the expert menu
Chapter 6.5 „Expert settings“ before making any other settings.
Содержание ZP SPEEDCONTROL COMFORT
Страница 48: ...en48 ZP SPEEDCONTROL COMFORT en English...