en16
Safety instructions
The electric connection must be made via a socket with grounding
(mandatory provision according to DIN VDE 100)
Should the power supply not take place by a mandatory FI
operator protection circuit breaker with a rated residual current
with max. 30 mA, then the pump must be connected to the socket
via a separate FI operator protection circuit breaker (mandatory
provision according to EN 60 335-2)
Basically, a separate FI circuit breaker with own supply cable to
the controller is recommended so that potential interaction with
other parts of the electrical installation can be excluded
Extension cables must have at least the same cable cross section
as the connecting cable of the pump
ZP SPEEDCONTROL COMFORT
en
English
5 Installation
5.1 Preparations
Check whether according to the packaging the plant is suitable for the power system (230
V / 50 Hz). Make sure that all safety rules are observed. Check to make sure that the
requirements in
Chapter 2.2 “Intended use“ are complied with.
1. Remove the controller from the package.
2. Check for perfect external condition (transport damage).
Содержание ZP SPEEDCONTROL COMFORT
Страница 48: ...en48 ZP SPEEDCONTROL COMFORT en English...