![YSI 2900 series Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/ysi/2900-series/2900-series_operation-and-maintenance-manual_915294027.webp)
26
Unscrew and remove the lid from the empty calibrator bottle (Cal1A–Cal3B as indicated).
IMPORTANT
: make every effort to avoid contamination of the lid and level sensor assemblies.
Mark the date of installation on the label of the new bottle of YSI calibrator solution.
Place the new bottle of calibrator in the bottle rack as indicated on the display.
Screw the lid and level sensor assembly onto it.
Repeat this process for any additional calibrator bottles (Cal1A–Cal3B as indicated).
Install Membranes and ISEs
4.9
4.9.1 Enzyme Membranes
Each biosensor probe installed in your instrument is fitted with a protective "shipping membrane" which must be removed
and replaced with a new membrane.
Make sure you install the correct membrane for each chemistry you are
measuring.
Enzyme membranes are color-coded for each type of chemistry. It is important that you install the specific membrane as
indicated on each probe (A or B).
.
Probe A is always on the left when looking in from the side of the instrument
Figure 4.4
Probe B
Probe A