3.4 Mounting
CAUTION!
In the phase of installation the "Check list Installation" of the appendix is
to be used.
Appendix B ‘Checklist installation’ page 131
–
Make sure that the installation is complete in accordance with the
installation and wiring plan.
–
Make sure that you bring a supply voltage separation in the wiring in
accordance to SELV / PELV.
–
After the installation make a visual inspection and check all compo-
nents for visible damages.
–
Check the system for wiring errors.
–
Check the tensile strength of the electrical terminal and screw con-
nections.
–
Ensure the installation and wiring in accordance to valid standards
and guidelines.
–
Make sure that the environmental characteristics of the system, which
are described in chapter 2, are not exceeded.
Chap. 2.10 ‘SDO 4xDC 24V 0.5A -
–
Make sure that the type of safety system is sufficient.
–
Make sure that the safety system will not be damaged by moving
parts or working in the environment of the installed safety compo-
nents.
–
Make sure that the system components do not get in contact to
aggressive media (e.g. acid, leaches, gear oil).
3.4.1 Requirements to the operating personnel
Qualified personnel are persons who, based on their education, experiences, instructions
about valid standards and regulations, accident prevention regulations and operation con-
ditions, are authorized by the plant safety executive manager to execute the required
actions and to recognize and avoid potential hazards. The required qualifications for this
duty are e.g.:
n
Training or instruction in accordance with the standards of the safety engineering in
care and use of appropriate safety equipment.
DANGER!
Risk of life by electrical current!
Devices and the environment in the switch gear cabinet can remain at
dangerous potentials.
–
For this before you start with work make sure that the device and the
environment are off circuit.
–
Observe the relevant safety regulations when handling with high-
voltage devices.
–
Make sure that only qualified personnel installs this module.
VIPA System SLIO
Deployment
Mounting > Requirements to the operating personnel
HB300 | SM-S | 02x-1SD10 | en | 20-02
74