B95W
Initial installation and settings
04_Erstinstallation und Einstellungen_en.fm - V1.0 - 1.8.17
47 / 306
4
48
4
Initial installation and settings
4.1
Initial instruction
The attaching of the attachable equipment and commission thereof should only
be carried out by qualified technicians.
The machine must only be operated by properly trained and instructed personnel.
For this purpose, appropriate instruction and training are provided when the
machine is handed over.
4.1.1
Hand over the machine and instruct the operator.
The following checklist should be followed when handing over the machine to
the operator:
Operating
instructions
Go through the operating instructions (page by page) and explain them in
detail through practical training on the machine.
Items which are particularly important include:
•
Accident Prevention Regulations published by the employer’s liability
insurance associations in the user's country
•
Technical data
•
Control, indicating, and warning elements
•
Checks before commissioning the machine
•
Engine running-in instructions
•
Starting and shutting down the engine
•
Explanation of the hydrostatic travel drive
•
Driving
•
Recovery and transport of the machine
•
Operation of all functions
•
Explanation of maintenance and inspection intervals according to
maintenance and inspection plan by demonstrating maintenance points
on machine
•
Lubrication intervals and lubricating points according to overview of
lubricating points and demonstration of these points on the machine
•
Handing over the engine operating instructions
Notice
An initial inspection must be carried out before commissioning.
See chapter 6.6.1 “Initial inspection (delivery inspection)”.
Содержание B95W
Страница 2: ......
Страница 8: ...B95W Table of contents 6 306 1 01_Inhaltsverzeichnis_enIVZ fm V1 0 1 8 17 10 ...
Страница 52: ...B95W Description 50 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Страница 58: ...B95W Description 56 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Страница 206: ...B95W Maintenance 204 306 6 06_Wartung und Pflege_en fm V1 0 1 8 17 20 ...
Страница 208: ...B95W Operation 206 306 7 07_Bedienung_en fm V1 0 1 8 17 26 ...
Страница 238: ...B95W Operation 236 306 7 07_Bedienung_en fm V1 0 1 8 17 26 Optional SAE control system Fig 7 14 Lever control 3 5 4 1 2 ...
Страница 272: ...B95W Transport 270 306 8 08_Transport_en fm V1 0 1 8 17 27 ...
Страница 302: ...B95W Troubleshooting 300 306 10 10_Fehlerbeseitigung_en fm V1 0 1 8 17 30 ...
Страница 309: ......
Страница 310: ...http www yanmar eu MOBILE EXCAVATOR ...