Working in the vicinity of underground power
lines
Before commencing excavation work using the machine, it must be determined
whether any underground power lines are present in the intended working
zone which may present a danger to persons.
If underground power lines are present, their exact position and course must
be determined in consultation with the proprietor or operator of the lines, and
the necessary safety precautions decided and implemented.
Before starting any earth work, clearly mark the route of lines in the
construction site area while under supervision. If the position of lines cannot
be determined, search ditches must be dug - manually, if need be.
If any underground power lines or their protective coverings are encountered
unexpectedly or damaged, stop work immediately and inform the supervisor.
In case of arcing, adhere to BGR 500 K.2.12, 3.12.
Maintain a safe distance from the power lines.
3.16
Working in the vicinity of overhead power lines
If the machine is being used in the vicinity of overhead power lines and trolley
wires, a safety distance (which varies depending on the nominal voltage of the
overhead line) must be maintained between the lines and the machine and its
work equipment, to prevent current overspill. This also applies to the distance
between these lines and attachments or loads.
Prescribed
safety distance
The safe distance depends on the nominal voltage of the overhead power line.
Tab. 3-3 Prescribed safety distances
Nominal voltage
Safety distance
0 to 50 kV
3 m
over 50 to 200 kV
4.6 m
over 200 to 350 kV
6.1 m
over 350 kV to 500 kV
7.6 m
over 500 kV to
750 kV
10.7 m
over 750 kV to 1,000 kV
13.7 m
Unknown
min. 13.7 m
Содержание B95W
Страница 2: ......
Страница 8: ...B95W Table of contents 6 306 1 01_Inhaltsverzeichnis_enIVZ fm V1 0 1 8 17 10 ...
Страница 52: ...B95W Description 50 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Страница 58: ...B95W Description 56 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Страница 206: ...B95W Maintenance 204 306 6 06_Wartung und Pflege_en fm V1 0 1 8 17 20 ...
Страница 208: ...B95W Operation 206 306 7 07_Bedienung_en fm V1 0 1 8 17 26 ...
Страница 238: ...B95W Operation 236 306 7 07_Bedienung_en fm V1 0 1 8 17 26 Optional SAE control system Fig 7 14 Lever control 3 5 4 1 2 ...
Страница 272: ...B95W Transport 270 306 8 08_Transport_en fm V1 0 1 8 17 27 ...
Страница 302: ...B95W Troubleshooting 300 306 10 10_Fehlerbeseitigung_en fm V1 0 1 8 17 30 ...
Страница 309: ......
Страница 310: ...http www yanmar eu MOBILE EXCAVATOR ...