3. Install:
9
Spring
1
9
Brake pedal
2
9
O-ring
3
9
Bolt (brake pedal)
4
9
Clip
5
NOTE:
9
Apply the lithium soap base grease on the
bolt, O-ring and brake pedal bracket.
9
Install the clip with its stopper portion
a
fac-
ing inward.
5-22
CHAS
FRONT BRAKE AND REAR BRAKE
2. Install:
9
Brake lever
1
9
Bolt (brake lever)
2
9
Nut (brake lever)
3
NOTE:
Apply the lithium soap base grease on the
brake lever sliding surface, bolt and contacting
surface of the master cylinder piston.
EC5A5400
Rear master cylinder
1. Install:
9
Reservoir hose
1
9
Reservoir tank
2
NOTE:
Pass the reservoir hose into the hose guide.
2. Install:
9
Master cylinder
1
9
Bolt (master cylinder)
2
6 Nm (0.6 m•kg, 4.3 ft•lb)
6 Nm (0.6 m•kg, 4.3 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
26 Nm (2.6 m•kg, 19 ft•lb)
5NY-9-30-5A 5/23/01 9:01 PM Page 44
Содержание YZ125(P)/LC
Страница 128: ...3 3 INSP ADJ MEMO...
Страница 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Страница 562: ...TUN MEMO...
Страница 563: ......