4-40
ENG
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
EC4C3000
REMOVAL POINTS
EC483111
Primary drive gear
1. Loosen:
9
Bolt (primary drive gear)
1
NOTE:
Place an aluminum plate
a
between the teeth of
the primary drive gear
2
and driven gear
3
.
EC4B3101
Kick axle assembly
1. Remove:
9
Kick axle assembly
1
NOTE:
Unhook the torsion spring
2
from the hole
a
in
the crankcase.
EC4C3101
Shift guide and shift lever assembly
1. Remove:
9
Bolt (shift guide)
9
Shift guide
1
9
Shift lever assembly
2
NOTE:
The shift lever assembly is disassembled at the
same time as the shift guide.
EC4C4000
INSPECTION
EC4B4100
Kick axle and kick gear
1. Check:
9
Kick gear smooth movement
Unsmooth movement
→
Replace.
2. Inspect:
9
Kick axle
1
Wear/Damage
→
Replace.
EC4B4200
Kick gear and kick idle gear
1. Inspect:
9
Kick gear
1
9
Kick idle gear
2
9
Gear teeth
a
Wear/Damage
→
Replace.
5NY-9-30-4C 5/23/01 8:56 PM Page 6
Содержание YZ125(P)/LC
Страница 128: ...3 3 INSP ADJ MEMO...
Страница 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Страница 562: ...TUN MEMO...
Страница 563: ......