5-25
POWR
E
CYLINDERS
CYLINDERS
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
CYLINDER REMOVAL
Follow the left “Step” for removal.
YPVS
Refer to “YPVS”.
Cylinder head
Refer to “CYLINDER HEAD”.
1
Bolt
12
2
Cylinder
3
3
Cylinder gasket
3
4
Pin
6
Reverse the removal steps for installation.
NOTE:
Tighten the bolts in a crisscross pattern
and in two stages.
NOTE:
Install the original position.
Not reusable
Содержание WaveRunner XL1200Ltd
Страница 1: ...LIT186160198 LIT 18616 01 98 F0D 28197 Z9 11 SERVICE MANUAL WaveRunner XL1200Ltd ...
Страница 87: ...5 8 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 240: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ...YAMAHA MOTOR CO LTD Printed in USA Mar 1999 1 CR XA1200X Printed on recycled paper ...