5-14
POWR
E
ENGINE UNIT
SERVICE POINTS
Shim removal
1. Remove:
●
Shims
NOTE:
To ease reassembly and coupling align-
ment, remove the shims and organize them
in their respective groups (e.g., front right,
rear left) prior to removing the mounting
bolts.
Engine mount inspection
1. Inspect:
●
Engine mounts
Cracks/damage
→
Replace.
Coupling clearance inspection
1. Measure:
●
Clearance
a
●
Clearance
b
(with a straightedge and thickness
gauge)
Out of specification
→
Adjust with the
shims.
NOTE:
Before measuring the clearance, remove
the rubber damper.
Clearance
a
:
0 ~ 1.0 mm (0 ~ 0.039 in)
Clearance
b
:
2 ~ 4 mm (0.079 ~ 0.157 in)
Содержание WaveRunner XL1200Ltd
Страница 1: ...LIT186160198 LIT 18616 01 98 F0D 28197 Z9 11 SERVICE MANUAL WaveRunner XL1200Ltd ...
Страница 87: ...5 8 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 240: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ...YAMAHA MOTOR CO LTD Printed in USA Mar 1999 1 CR XA1200X Printed on recycled paper ...