8-29
E
HULL
HOOD
SHIFT LEVER
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
BASE DISASSEMBLY
Follow the left “Step” for disassembly.
1
Bolt/washer
2/2
2
Plate
1
3
Spring
1
4
Actuator
1
5
Roller
1
6
Shaft
1
7
Shift arm
1
Reverse the disassembly steps for
assembly.
Содержание WaveRunner XL1200Ltd
Страница 1: ...LIT186160198 LIT 18616 01 98 F0D 28197 Z9 11 SERVICE MANUAL WaveRunner XL1200Ltd ...
Страница 87: ...5 8 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 240: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ...YAMAHA MOTOR CO LTD Printed in USA Mar 1999 1 CR XA1200X Printed on recycled paper ...