5-35
POWR
E
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
STATOR COIL AND PICKUP COIL
REMOVAL
Follow the left “Step” for removal.
1
Bolt
3
2
Washer
1
3
Cable holder
1
4
Bolt
2
5
Pickup coil
1
6
Bolt
3
7
Stator coil
1
Reverse the removal steps for installation.
NOTE:
This washer holds the pickup coil lead.
Make sure to not pinch the lead between
the projection and the washer when
installing the bolt.
GENERATOR AND STARTER MOTOR
Содержание WaveRunner XL1200Ltd
Страница 1: ...LIT186160198 LIT 18616 01 98 F0D 28197 Z9 11 SERVICE MANUAL WaveRunner XL1200Ltd ...
Страница 87: ...5 8 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 240: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ...YAMAHA MOTOR CO LTD Printed in USA Mar 1999 1 CR XA1200X Printed on recycled paper ...