3-15
INSP
ADJ
E
ELECTRICAL/JET PUMP UNIT
5. Install:
●
Battery breather hose
1
●
Battery
●
Positive lead
2
●
Negative lead
3
●
Battery band
CAUTION:
●
Connect the positive lead to the battery
terminal first.
●
Make sure the battery leads are con-
nected properly. Reversing the leads can
seriously damage the electrical system.
●
Make sure that the battery breather hose
is properly connected and is not
obstructed.
●
Coat the terminals with a water resistant
grease to minimize terminal corrosion.
JET PUMP UNIT
Impeller inspection
1. Check:
●
Impeller
1
Damage/wear
→
Replace.
Nicks/scratches
→
File or grind.
2. Measure:
●
Impeller-to-housing clearance
a
Out of specification
→
Replace.
Max. impeller-to-housing
clearance:
0.9 mm (0.035 in)
Measurement steps:
●
Remove the battery leads.
●
Remove the intake screen
1
and duct
2
.
●
Measure the clearance at each impel-
ler blade as shown (a total of four
measurements).
●
Install the intake screen.
T
R
.
.
Bolt:
M6: 8 Nm (0.8 m • kg, 5.8 ft • lb)
M8: 17 Nm (1.7 m • kg, 12 ft • lb)
●
Install the battery leads.
Содержание WaveRunner XL1200Ltd
Страница 1: ...LIT186160198 LIT 18616 01 98 F0D 28197 Z9 11 SERVICE MANUAL WaveRunner XL1200Ltd ...
Страница 87: ...5 8 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 240: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ...YAMAHA MOTOR CO LTD Printed in USA Mar 1999 1 CR XA1200X Printed on recycled paper ...