8-6
E
HULL
HOOD
HANDLEBAR
SERVICE POINTS
Handlebar inspection
1. Inspect:
●
Handlebar
Bends/cracks/damage
→
Replace.
Handlebar switch inspection
Refer to “STARTING SYSTEM” in
chapter 7.
Handlebar assembly installation
1. Install:
●
QSTS cables
●
Buzzer lead
●
Handlebar switch lead
●
Throttle cable
NOTE:
After inserting the cables and leads into the
grommets, tie the end of grommets with
the bands
1
.
2. Install:
●
Upper handlebar holder
1
CAUTION:
Clearance
a
should be narrower than
clearance
b
.
NOTE:
●
Align the punch mark
c
on the handlebar
with the top surface of the handlebar
holder.
●
The upper handlebar holder should be
installed with the punch mark
d
facing
forward.
Reference clearance:
a
: 1.5 mm (0.06 in)
b
: 3.5 mm (0.14 in)
Содержание WaveRunner XL1200Ltd
Страница 1: ...LIT186160198 LIT 18616 01 98 F0D 28197 Z9 11 SERVICE MANUAL WaveRunner XL1200Ltd ...
Страница 87: ...5 8 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 240: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ...YAMAHA MOTOR CO LTD Printed in USA Mar 1999 1 CR XA1200X Printed on recycled paper ...