CABLE ROUTING (FJR13AG)
2-36
1. Grip warmer lead (right)
2. Brake hose (front brake master cylinder to brake
pipe/lower joint assembly)
3. Handlebar switch lead (right)
4. Clutch hose
5. Handlebar switch lead (left)
6. Clutch switch lead
7. Main switch lead
8. Immobilizer unit lead
9. Front wheel sensor lead
10. Brake hose (brake pipe/upper joint assembly to
front brake calipers)
11. Brake hose (metering valve to right front brake
caliper)
12. Relay unit lead
13. Main fuse lead
14. Auxiliary light coupler
15. Headlight sub-wire harness coupler
16. Positive battery lead
17. Front turn signal/position light coupler (right)
18. Throttle cable (accelerator cable)
19. Throttle cable (decelerator cable)
20. Front brake light switch lead
A. Pass the clutch hose, handlebar switch leads, grip
warmer leads, front brake light switch lead, and
clutch switch lead through the guide.
B. Route the main switch lead to the inside of the
clutch hose.
C. Fasten the right handlebar switch lead, right grip
warmer lead, front brake light switch lead, main
switch lead, and immobilizer unit lead with a plastic
locking tie. Face the end of the plastic locking tie
downward, angled inward, and then cut off the
excess end of the tie.
D. Route the immobilizer unit lead to the inside of the
clutch hose.
E. Insert the projection on the wire harness holder
completely into the hole in the electrical
components tray.
F. To electrical components board
G. Pass the brake hose (front brake master cylinder to
brake pipe/lower joint assembly), right handlebar
switch lead, right grip warmer lead, throttle cables,
and front brake light switch lead through the guide
as shown in the illustration.
H. Fasten the right grip warmer lead to the throttle
cables with a plastic locking tie 10 mm (0.39 in) or
less from the end of the throttle cable boot, and
then cut off the excess end of the tie.
I.
Route the right handlebar switch lead, right grip
warmer lead and front brake light switch lead under
the handlebar.
J. Route the left handlebar switch lead, left grip
warmer lead and clutch switch lead under the
handlebar.
Содержание FJR13AG
Страница 1: ...2016 SERVICE MANUAL FJR13AG FJR13ESG B88 28197 70 E0 ...
Страница 6: ......
Страница 8: ......
Страница 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 21 EAS30021 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Страница 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 1 3 2 ...
Страница 77: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 24 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Страница 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 6 5 4 3 2 1 ...
Страница 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 1 2 3 4 5 6 7 8 9 ...
Страница 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 4 5 3 2 1 9 8 6 7 ...
Страница 84: ...COOLING SYSTEM DIAGRAMS 2 31 EAS20020 COOLING SYSTEM DIAGRAMS 3 13 4 5 6 7 7 7 8 1 2 10 9 14 15 16 17 11 12 3 ...
Страница 86: ...COOLING SYSTEM DIAGRAMS 2 33 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Страница 94: ...CABLE ROUTING FJR13AG 2 41 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Страница 98: ...CABLE ROUTING FJR13AG 2 45 Rear fender left side view 3 4 5 B 1 2 A 6 7 C 1 11 12 8 9 10 13 D E F 15 14 15 G H ...
Страница 102: ...CABLE ROUTING FJR13AG 2 49 Rear fender top view 1 2 3 A B 4 5 6 C C D ...
Страница 108: ...CABLE ROUTING FJR13AG 2 55 Fuel tank and canister B C 2 3 1 A A ...
Страница 114: ...CABLE ROUTING FJR13ESG 2 61 Rear brake hose right side view 4 5 6 7 8 9 10 11 1 12 13 14 15 2 3 16 1 A B C F E D ...
Страница 116: ...CABLE ROUTING FJR13ESG 2 63 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Страница 124: ...CABLE ROUTING FJR13ESG 2 71 Rear fender top view 7 E 6 D 5 C C 1 2 3 4 A B 8 9 10 ...
Страница 130: ...CABLE ROUTING FJR13ESG 2 77 Fuel tank and canister B C 2 3 1 A A ...
Страница 132: ...CABLE ROUTING FJR13ESG 2 79 ...
Страница 135: ......
Страница 173: ......
Страница 305: ...REAR SHOCK ABSORBER ASSEMBLY FJR13ESG 4 132 5 Install the rear fender bolts 1 and quick fas teners 2 1 1 2 2 ...
Страница 364: ...GENERATOR AND STARTER CLUTCH 5 35 TIP Tighten the generator cover bolts in stages and in a crisscross pattern ...
Страница 389: ...SHIFT SHAFT 5 60 c Tighten both locknuts to specification T R Shift rod locknut 7 Nm 0 7 m kgf 5 1 ft lbf 1 2 c d a b ...
Страница 406: ...MIDDLE GEAR 5 77 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Страница 438: ...BALANCERS 5 109 ...
Страница 454: ...WATER PUMP 6 15 ...
Страница 468: ...AIR INDUCTION SYSTEM 7 13 EAS20071 AIR INDUCTION SYSTEM 1 2 3 5 6 7 8 1 1 2 1 1 3 6 7 8 2 2 3 5 4 ...
Страница 477: ......
Страница 485: ...IGNITION SYSTEM 8 8 ...
Страница 493: ...ELECTRIC STARTING SYSTEM 8 16 ...
Страница 499: ...CHARGING SYSTEM 8 22 ...
Страница 517: ...CORNERING LIGHT SYSTEM FJR13ESG 8 40 ...
Страница 527: ...SIGNALING SYSTEM 8 50 ...
Страница 613: ...FUEL INJECTION SYSTEM 8 136 ...
Страница 633: ...CRUISE CONTROL SYSTEM 8 156 ...
Страница 651: ...ACCESSORY BOX SYSTEM 8 174 ...
Страница 663: ...IMMOBILIZER SYSTEM 8 186 ...
Страница 669: ...ABS ANTI LOCK BRAKE SYSTEM 8 192 ...
Страница 722: ...ELECTRICAL COMPONENTS 8 245 6 1 3 2 17 20 19 18 7 8 11 12 13 14 15 16 4 5 10 9 ...
Страница 744: ...ELECTRICAL COMPONENTS 8 267 ...
Страница 779: ......
Страница 780: ......