E
STARTER MOTOR (EH/E MODELS)
ELEC
EXPLODED DIAGRAM
2
3
4
1
2
3
4
5
6
7
0
q
r
e
r
i
y
8
9
w
w
e
t
u
u
t
8 Nm (0.8 m•kg, 5.8 ft•lb)
9 Nm (0.9 m•kg, 6.5 ft•lb)
8-24
REMOVAL AND INSTALLATION CHART
Step
q
w
e
r
t
y
u
i
Q’ty
1
2
2
2
2
1
2
1
Service points
(5/16” tool)
1/4” (7/16” tool)
Reverse the disassembly steps for assembly.
Procedure/Part name
Stator
Bolt
Brush set
Spring
Nut
Brush set
Spring
Brush holder
Содержание F15A
Страница 500: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Страница 510: ......