E
UPPER CASE ASS’Y
BRKT
EXPLODED DIAGRAM
7-18
REMOVAL AND INSTALLATION CHART
Step
10
11
12
13
14
15
16
17
18
19
Q’ty
1
1
2
1
2
1
3
1
1
1
Service points
NOTE:
Disconnect the ground lead at all three
points.
c
C
Make sure no grease goes into the
water tube.
Reverse the disassembly steps for installation.
Procedure/Part name
Ground lead
Upper mount rubber damper (FT9.9D)
Nut
Plate
Washer
Water tube
Bolt
Upper damper
Baffle plate
Upper case ass’y
Содержание F15A
Страница 500: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Страница 510: ......