7-16
SPEC
WIRE ROUTING DIAGRAM
ENGINE AND GENERATOR
1
Control box
2
Control panel
3
Cover
å
Route the harness as shown and secure it to the
bracket.
∫
Secure it in the location of white tape.
ç
Install the connecter to the inside of the harness
(generator side).
∂
Fasten the generator lead to the bracket at the
plastic locking tie.
7DK40-07 6/15/09 3:01 PM Page 41
Содержание EF2000iS - Inverter Generator
Страница 2: ...7DK40 Cover 4 6 09 9 18 AM Page 2 ...
Страница 13: ...7DK40 00 6 15 09 2 54 PM Page 11 ...
Страница 17: ...7DK40 00 6 15 09 2 54 PM Page 15 ...
Страница 21: ...7DK40 00 6 15 09 2 54 PM Page 19 ...
Страница 223: ...ELEC 7DK40 05 6 12 09 6 01 PM Page 41 ...
Страница 233: ...ELEC 7DK40 05 6 12 09 6 01 PM Page 51 ...
Страница 255: ...TRBL 7DK40 06 6 15 09 10 30 AM Page 22 ...
Страница 310: ...7DK40 07 6 15 09 3 01 PM Page 55 ...
Страница 311: ...7DK40 Cover 4 6 09 9 18 AM Page 2 ...