36
maintenance
DEAlER MAINTENANCE CHART
MAINTENANCE CHART
PROCEDURE
DAILY
3
MONTHS
6
MONTHS
9
MONTHS
12
MONTHS
Gas leak inspection
X
Water leak inspection
X
Oil leak inspection
Quick-connect and hose
inspection
X
Check pump oil level
X
Change pump oil*
X
X
X
X
Check belt tension
X
X
X
X
Replace high pressure
nozzle
X
X
X
X
Test water pressure
X
X
Test water temperature
X
X
*The pump oil must be changed after the first 50 hours of operation and
every 250 hours or 3 months, whichever comes first.
PROCEDURE
12 MONTHS
Gas supply inspection
X
Clean gas line drip legs
X
Burner inspection
X
Exhaust ventilation inspection
X
Descale coil*
X
Test Voltage & Amp Draw
X
*Scale build-up will vary with mineral content in the water and amount of
usage. Descaling can range from monthly to yearly maintenance.
Содержание X-HW13008GENNG
Страница 1: ...operation manual X HW13008GENNG X HW33008GENNG NATURAL GAS HOT WATER PRESSURE WASHER...
Страница 2: ...2...
Страница 14: ...14 Features 0 Operator s Manual Hg series features HG SERIES FEATURES 032905 RZ features...
Страница 39: ...39...
Страница 40: ...40 If you need assistance with the assembly or operation of this Pressure Washer please call 1 866 770 1711...