Battery Maintenance
976-0043-01-02
C–13
Battery Maintenance
Maintenance
strategy
To get the best performance from an inverter system, the batteries must be
properly setup and maintained. This includes setting the proper voltages
for Bulk and Float charging. See the “CAUTIONS” in the section on
Equalization Charging that follows. In addition, the battery terminals
should be inspected, cleaned, and re-torqued if necessary.
Neglecting any of these items may result in poor inverter performance
and greatly reduce battery life.
Battery charging
Charge Rate
The maximum safe charge rate is related to the size and type of the
batteries. Flooded lead acid batteries (with removable caps) can be
charged at a high rate. Small batteries may require a lower charge rate.
Check with your battery vendor for the proper battery charging rate for
the batteries used in the system.
Bulk Voltage
This is the maximum voltage the batteries will be charged to during a
normal charge cycle. Gel cell batteries are set to a lower value and non-
sealed batteries are set to a higher voltage setting.
Float Voltage
The Float voltage is set lower than the Bulk voltage and provides a
maintenance charge on the batteries to keep them in a ready state.
Temperature
Compensation
For optimal battery charging, the Bulk and Float charge rates should be
adjusted according to the temperature of the battery. This can be
accomplished automatically by using a BTS. The sensor attaches directly
to the side of one of the batteries in the bank and provides precise battery
temperature information.
When battery charging voltages are compensated based on temperature,
the charge voltage will vary depending on the temperature around the
batteries. The following table describes approximately how much the
voltage may vary depending on the temperature of the batteries.
If you have liquid lead acid batteries (non-sealed), you may need to
periodically equalize your batteries. Check the water level monthly to
maintain it at the appropriate level.
Содержание SW Plus 2524
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 02 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Страница 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Страница 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Страница 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Страница 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Страница 200: ...Advanced Setup 7 22 976 0043 01 02 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 250: ...8 32...
Страница 274: ...A 16...
Страница 308: ...C 18...
Страница 312: ...D 4...
Страница 316: ...E 4...
Страница 338: ...I 6...
Страница 342: ...Index IX 4 976 0043 01 02...
Страница 343: ......