Pre-Configuration Planning
976-0043-01-02
2–7
Grounding Considerations
Types
Whether you are installing a new system or integrating new parts into an
existing system, the four types of grounding to consider are:
•
DC system grounding
•
Inverter grounding
•
Chassis grounding
•
Bonding the grounding system
DC System Grounding
Systems
The
Sine Wave Plus
can be used in either a positive or negative grounded
system. However, unless you are installing the inverter into an existing
positive grounded system (i.e., a telecommunications system), it is highly
recommended to use negative grounding.
Positive ground
In a positive ground, the positive conductor from the
battery bank is bonded to earth ground. This arrangement is most often
used in telecommunications systems where an isolated ground is a
requirement.
Negative ground
In a negative ground, the negative conductor from the
battery bank is bonded to earth ground. This is the most common form of
grounding methods used for residential and commercial applications. The
Sine Wave Plus
meets FCC part 15 Class B regulations in a negative
grounded system. See
“FCC Information to the User”
on
page viii
for
additional information.
Convention
The remainder of this guide will assume the negative ground convention.
Important:
The grounding requirements vary by country and by application.
All installations must comply with national and local codes and ordinances.
Consult local and/or national codes and the NEC/CEC for specific grounding and
bonding requirements for the desired installation.
Important:
The bonding of the DC negative (or positive in positive ground
applications) to ground can only be in one location in the DC system. This DC
ground bond must be made in a non-serviceable item in the DC system. The
Xantrex DC175 and DC250 can have the optional DC Bonding Block (DCBB)
installed to provide the DC system bond. Additionally, the Xantrex PVGFP can
also provide this bond and comply with NEC/CEC requirements for roof
mounted PV arrays installed on dwelling units (homes).
Содержание SW Plus 2524
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 02 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Страница 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Страница 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Страница 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Страница 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Страница 200: ...Advanced Setup 7 22 976 0043 01 02 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 250: ...8 32...
Страница 274: ...A 16...
Страница 308: ...C 18...
Страница 312: ...D 4...
Страница 316: ...E 4...
Страница 338: ...I 6...
Страница 342: ...Index IX 4 976 0043 01 02...
Страница 343: ......