Menu Item Descriptions
976-0043-01-02
7–25
If set point RN1 is selected in 25A RY7 Mode, the generator will
automatically shut off once the BULK and ABSORPTION stages of the
battery charging have completed or if the 24H RN2/Max Gen Run h:m
has elapsed.
If RN2 is selected in menu item 25A RY7 Mode, the generator will
automatically shut off once the 24H RN2/Max Gen Run Time h:m
period has elapsed.
Time of Day
The generator is automatically started each day at a pre-selected time
determined by the 24A GEN Run Time Start h:m value. Whenever the
generator starts automatically, based on this time, it will shut off once the
Time of Day clock has reached the 24B Gen Run Time Stop h:m value.
Exercise Period Days
The generator is automatically started at a pre-selected time (based on the
24D Quiet Time End h:m) whenever it exceeds a set number of days
without running.
Once the start command is initiated, the generator starts and runs for the
time period set by the 24F Gen Exercise Timer Minute setting. This is to
ensure that it remains fully operational and that the generator’s starting
battery is maintained at an optimal state of charge.
If the 24D Quiet Time End h:m is set for 13:00 and 24E Gen Exercise
Period Days is set to 10, the generator will start at 1:00 p.m. every tenth
day of continuous non-operation. To disable this feature, set the value
24E Gen Exercise Period Days to zero.
If the generator starts for any reason and runs for at least 5 minutes, this
timer counter resets.
Содержание SW Plus 2524
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 02 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Страница 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Страница 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Страница 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Страница 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Страница 200: ...Advanced Setup 7 22 976 0043 01 02 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 250: ...8 32...
Страница 274: ...A 16...
Страница 308: ...C 18...
Страница 312: ...D 4...
Страница 316: ...E 4...
Страница 338: ...I 6...
Страница 342: ...Index IX 4 976 0043 01 02...
Страница 343: ......