
Menu Item Descriptions
976-0043-01-02
7–23
Generator Starting Scenarios
The
Sine Wave Plus
can be configured to start and stop a majority of
backup generators, either manually or automatically. Automatic operation
can be triggered based on time, AC current, battery voltage, or to
exercising the generator.
Using automatic generator control features will require the programming
of the following Advanced Menu Headings:
•
24 Generator Timers Menu – This Menu sets parameters for
starting the generator based on time. In this menu, you can set the
generator to start and stop at a specified time. You can specify a quiet
time, an exercise time, and a cooldown period for the generator.
See
“24 Generator Timers Menu” on page 7–26
for specific
instructions on programming these menu items.
•
25 GEN Starting Details Menu – This Menu sets parameters for
starting the generator based on type of generator used.
See
“25 Gen Starting Details Menu” on page 7–29
for specific
instructions on programming these menu items into the
Sine Wave
Plus
.
•
26 GEN Auto Run Setup Menu – This Menu sets parameters for
starting the generator based on AC current and/or battery voltage.
See
“26 Gen Auto Run Setup Menu” on page 7–38
for more
information on setting the parameters for starting generators based on
AC current and battery voltage.
Manual Generator Control
The generator equipped for remote starting capabilities can be remotely
started by selecting ON from 02A Generator. If the generator started in
this manner, the 02C GEN Start Volts/Manual menu item will display
YES.
Important:
Automatic generator control features require the additional purchase of the
Xantrex GSM.
CAUTION: Damage to Generator
Generators used with this feature must have automatic-start capabilities and be
designed for stand-alone operation. Engine systems should self-protect against
any conditions that may cause the generator to malfunction or become damaged.
Содержание SW Plus 2524
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 02 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Страница 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Страница 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Страница 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Страница 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Страница 200: ...Advanced Setup 7 22 976 0043 01 02 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 250: ...8 32...
Страница 274: ...A 16...
Страница 308: ...C 18...
Страница 312: ...D 4...
Страница 316: ...E 4...
Страница 338: ...I 6...
Страница 342: ...Index IX 4 976 0043 01 02...
Страница 343: ......